Dicken Elementary

Dicken Elementary, originally constructed in 1957, is a one-story masonry structure with exterior brick veneer. The school facility is situated on 10 acres in the west sector of Ann Arbor. The original structure has experienced at least 1 addition over the years, and currently supports Y5 – Grade 5.

To sign up to receive email updates regarding the Dicken Elementary major construction project, please click here.

Stats

  • Building Size43,199 sq ft
  • Land Area10 acres

Projects

All Active Complete Upcoming

For the latest bond project news and updates for Dicken Elementary, please see below.

Dicken Elementary Presentation Link – September 9, 2024

Dicken Elementary Follow-up Questions & Answers – October 2024

  • Major Project

    2023-2027

  • Community Update - New Dicken Elementary

    2024

    Ann Arbor Public Schools plans to construct a New Dicken Elementary, with related site improvements, slated for groundbreaking as early as Spring 2025. Please join us for a Bond Project Update, we will have Phase 2 Bond Plan background information and a conceptual site plan to share.

    Come to the school’s main entry and you will be directed to the space in the building where the update is being held. We look forward to seeing you!

    Monday, September 9, 2024 from 5:30pm to 7pm

    Dicken Elementary: 2135 Runnymeade Blvd, Ann Arbor, MI 48103

  • A/C and Lighting Upgrades

    2021-2022

    Addition of air conditioning and replacement of existing lights with LED light fixtures. Classrooms to have a dimmable lighting system and new ceiling tiles.

  • Paving Project

    2021

    Remove & replace existing drop off loops located at schools. Add storm water and pedestrian crossings.

  • Window Shades

    2021

    New window shades added to the building

  • Roofing Upgrades

    2020

    Construction/repairs of school roof.

  • HVAC Building Management System Upgrades

    2019

    Updated the school’s Building Management System (BMS) to the latest version including a new graphical interface and mobile, cloud-based access. The upgrades allow for better systems control, improved occupant comfort and energy efficiency.

  • Water Bottle Filling Stations

    2019

    Installation of filtered water bottle filling stations throughout the school.

  • Security Updates

    2019

    Update to security system on property.

  • Playground Shaded Trees

    2019-2020

    Planted 21 native hardwood trees for shading of playgrounds and other outdoor environments.

  • New Playgrounds

    2017

    New upper and lower elementary playgrounds were added. New equipment includes sensory waves, hexamid climbers, platforms, slides, climbing net, rings and swings.

  • New Musical Instruments

    2017-2018

    Purchase of new musical instruments and pianos for music classrooms and auditoriums.

  • Parking Lot Reconstruction

    2017

    Repair of pavement and parking lot on school grounds.

  • New Classroom Furniture

    2017

    New, flexible, classroom furniture was added to create a more accessible, engaging and student-centered environment.