Projects
-
Public Address and Clocks Replacement
Installing a new internet protocol digital public address and clock system that is managed through a single integrated platform. The new system will allow for ease of programming, the integration of phone systems and mobile devices, and enhanced alerts in case of emergency situations, with both visual and audible messages.
-
Solar Array Installation
Rooftop solar array installation is scheduled for Summer 2026.
-
Elevator Improvements
The elevator modernization includes new mechanical equipment, a new cab, new entrances and hoistway doors installed in the existing elevator shaft. Work is scheduled for Summer/Fall 2026.
-
Auxiliary Athletic Field Synthetic Turf Replacement
Removal, disposal, and replacement of existing auxiliary athletic field. Install new synthetic athletic turf at the existing athletic field.
-
Pool Locker Room-Locker Replacement
Remove existing pool locker room lockers and install new plastic lockers.
-
Pool Scoreboard
Purchase and install new, full color LED scoreboard on the pool deck.
-
Theater Audio & Lighting Improvements
Installation of new audio and lighting in the theater, as well as structural improvements/support for the plasma screens.
-
Auto Lab Improvements
New coating of the auto lab floors.
-
Solar Array Screen Wall
Construction of a new solar screen wall on the exterior grounds of the school.
-
Theater Rigging Improvements
Replace existing counterweight stage rigging system with new electronic hoist system.
-
Roofing Updates
Construction and repairs of the school roof.
-
Solar Array Installation
New solar array installed on the roof.
-
Lighting Upgrades
Replacement of existing lights with LED light fixtures. Classrooms to have dimmable lighting system.
-
Parking Lot Trees
Shade trees were added to the parking lot.
-
Running Track Repairs & Updates
Updates and repairs were made to the running track.
-
Major Parking Lot Reconstruction
School parking lots went through a major reconstruction and stormwater improvements.
-
Gym and Pool Roof Replacement
Roof replacement was completed for both the gym and pool.
-
Kitchen Ventilation System Replacement
Replacement of all ventilation in the school kitchen.
-
Pool Filtration Updates & Replacement
Updates were made to the school pool.
-
Athletics Access Road
Construction and repairs were completed on the athletics access road.
-
HVAC Building Management System Upgrades
Updated the school’s Building Management System (BMS) to the latest version including a new graphical interface and mobile, cloud-based access. The upgrades allow for better systems control, improved occupant comfort and energy efficiency.
-
Water Bottle Filling Stations
Installation of filtered water bottle filling stations throughout the school.
-
Security Updates
Update to security system on property.
-
New Athletic Turf
The football stadium received a new turf with an organic fill.
-
Chiller Replacement
The chiller for the building was replaced with a new one.
-
Cafeteria Renovation
Renovations to the cafeteria took place including new front doors and new lights in the stairway.
-
Roofing Updates
Construction/repairs of multiple sections of the school roof.
-
New Classroom Furniture
New, flexible, classroom furniture was added to create a more accessible, engaging and student-centered environment.
-
Tennis Court Renewal
School tennis courts were refinished.
-
Emergency Gym Floor Restoration
Restoration of the gym floor due to damage.
-
E-Wing Roof
Roof repairs on the east wing.
-
New Musical Instruments
Purchase of new musical instruments and pianos for music classrooms and auditoriums.
Pioneer High School
- Built In 1956
- Grades 9th-12th
- School Website
Pioneer High School, originally constructed in 1956, is a three-story masonry structure with exterior brick veneer. The school facility is situated on 177 acres in the southwest sector of Ann Arbor. The original structure has experienced at least 5 additions over the years, and currently supports Grades 9-12.