Pioneer High School

Pioneer High School, originally constructed in 1956, is a three-story masonry structure with exterior brick veneer. The school facility is situated on 177 acres in the southwest sector of Ann Arbor. The original structure has experienced at least 5 additions over the years, and currently supports Grades 9-12.

Stats

  • Building Size404,692 sq ft
  • Land Area177 acres

Projects

All Active Complete Upcoming

Construction Update!

Construction activity is currently in progress at Pioneer High School! You may have noticed some activity in and around the school this summer. This project includes restoration work on the big theater and rigging improvements to both theaters, roofing repairs and solar panel installation. This project is anticipated to be completed by the fall of 2022.

More Questions? Visit our FAQ pageĀ here.

  • Solar Array Installation

    2022-2023

    New solar array installed on the roof.

  • Theater Lighting Upgrade

    In Progress

    Upgrade to lighting and fixtures throughout the theater.

  • Theater Rigging Improvements

    Replace existing counterweight stage rigging system with new electronic hoist system.

  • Roofing Updates

    2022

    Construction and repairs of the school roof.

  • Lighting Upgrades

    2022

    Replacement of existing lights with LED light fixtures. Classrooms to have dimmable lighting system.

  • Parking Lot Trees

    2020

    Shade trees were added to the parking lot.

  • Running Track Repairs & Updates

    2020

    Updates and repairs were made to the running track.

  • Major Parking Lot Reconstruction

    2020

    School parking lots went through a major reconstruction and stormwater improvements.

  • Gym and Pool Roof Replacement

    2020

    Roof replacement was completed for both the gym and pool.

  • Kitchen Ventilation System Replacement

    2019

    Replacement of all ventilation in the school kitchen.

  • Pool Filtration Updates & Replacement

    2019

    Updates were made to the school pool.

  • Athletics Access Road

    2019

    Construction and repairs were completed on the athletics access road.

  • HVAC Building Management System Upgrades

    2019

    Updated the school’s Building Management System (BMS) to the latest version including a new graphical interface and mobile, cloud-based access. The upgrades allow for better systems control, improved occupant comfort and energy efficiency.

  • Water Bottle Filling Stations

    2019

    Installation of filtered water bottle filling stations throughout the school.

     

  • Security Updates

    2019

    Update to security system on property.

  • New Athletic Turf

    2019

    The football stadium received a new turf with an organic fill.

     

  • Chiller Replacement

    2019

    The chiller for the building was replaced with a new one.

  • Cafeteria Renovation

    2019

    Renovations to the cafeteria took place including new front doors and new lights in the stairway.

  • Roofing Updates

    2018

    Construction/repairs of multiple sections of the school roof.

  • New Classroom Furniture

    2018

    New, flexible, classroom furniture was added to create a more accessible, engaging and student-centered environment.

  • Tennis Court Renewal

    2018

    School tennis courts were refinished.

  • Emergency Gym Floor Restoration

    2018

    Restoration of the gym floor due to damage.

  • E-Wing Roof

    2018

    Roof repairs on the east wing.

  • New Musical Instruments

    2017-2018

    Purchase of new musical instruments and pianos for music classrooms and auditoriums.

  • Paving Project

    2025

    Repair of pavement on school grounds.

  • Major Project

What's Happening

Browse Projects