Bach Elementary

Bach Elementary, originally constructed in 1922, is a three-story masonry structure with exterior brick veneer. The school facility is situated on 7.8 acres in the northwest sector of Ann Arbor. The original structure has experienced at least 3 additions over the years, and currently supports Y5 – Grade 5.

Stats

  • Building Size53,090 sq ft
  • Land Area7.8 acres

Projects

All Active Complete Upcoming

Summer Construction Update!

You might notice some work taking place in and around your school this summer. Construction will begin during summer break on projects approved as part of the 2019 bond, including those that will enhance the health, safety and learning experience for students and staff. This summer Bach Elementary will be receiving air conditioning and lighting upgrades, along with new power equipment installed on the rooftop. This work may result in areas around the school and parking lot that are being blocked off for equipment and construction crew. Bach will also be receiving paving improvements that will result in the temporary closing of the school’s main parking lots as this work is taking place. Thank you for your patience as we complete this work.

More Questions? Visit our FAQ pageĀ here.

  • A/C and Lighting Upgrades

    In Progress

    Addition of air conditioning and replacement of existing lights with LED light fixtures. Classrooms to have a dimmable lighting system and new ceiling tiles.

  • Paving Project

    2023

    Repair of pavement and parking lots on school grounds.

  • Window Shades

    2022

    New window shades added to the building.

     

  • HVAC Building Management System Upgrades

    2019

    Updated the school’s Building Management System (BMS) to the latest version including a new graphical interface and mobile, cloud-based access. The upgrades allow for better systems control, improved occupant comfort and energy efficiency.

  • Water Bottle Filling Stations

    2019

    Installation of filtered water bottle filling stations throughout the school.

  • Security Updates

    2019

    Update to security system on property.

  • New Playground Equipment

    2018

    New playground equipment was added.

  • Roofing Updates

    2018

    Construction/repairs of school roof.

  • Parking Lot Repairs

    2017

    Repair of pavement and parking lot on school grounds.

  • New Musical Instruments

    2017-2018

    Purchase of new musical instruments and pianos for music classrooms and auditoriums.

  • New Classroom Furniture

    2017

    New, flexible, classroom furniture was added to create a more accessible, engaging and student-centered environment.

  • Major Project