Tappan Middle School, originally constructed in 1950, is a three-story masonry structure with exterior brick veneer. The school facility is situated on 20 acres in the southeast sector of Ann Arbor. The original structure has experienced at least 4 additions over the years, and currently supports Grades 6-8.
Tappan Middle School
- Built In 1950
- Grades 6th-8th
- School Website
Projects
-
Plaza and Cafeteria Renovations
Renovations/additions to the plaza and school cafeteria. Raised door opening to exterior grade level, installed new door and frame, installed new stairs and handrails within the cafeteria.
-
Paving Improvements
-
Solar Array Installation
New solar array installed on the roof.
-
Elevator Improvements
The existing elevator will be modernized with a new elevator cab, controls, and hydraulic pumps.
-
Roofing Replacement
Replacement of building roof system prior to installation of new solar array on roof.
-
A/C and Lighting Upgrades
Addition of air conditioning and replacement of existing lights with LED light fixtures. Classrooms to have a dimmable lighting system and new ceiling tiles.
-
Theater Rigging Improvements
Replace existing counterweight stage rigging system with new electronic hoist system.
-
Fire Suppression
New fire alarm system, added fire suppression system, electrical service upgrade, and new ceilings will also be installed.
-
Masonry Parapet & Stone Coping Improvements
Masonry repair work will occur at the roof parapet walls. Stone coping repair and replacement will also be taking place.
-
HVAC Construction in Band & Orchestra Rooms
-
HVAC Building Management System Upgrades
Updated the school’s Building Management System (BMS) to the latest version including a new graphical interface and mobile, cloud-based access. The upgrades allow for better systems control, improved occupant comfort and energy efficiency.
-
Water Bottle Filling Stations
Installation of filtered water bottle filling stations throughout the school.
-
Security Updates
Update to security system on property.
-
Public Address and Clocks Replacement
Installed a new internet protocol digital public address and clock system that is managed through a single integrated platform. The new system allows for ease of programming, the integration of phone systems and mobile devices, and enhanced alerts in case of emergency situations, with both visual and audible messages.
-
Tennis Court Renewal
The school tennis courts were refinished.
-
New Classroom Furniture
New, flexible, classroom furniture was added to create a more accessible, engaging and student-centered environment.
-
Gym Floor Replacement
The school gymnasium was replaced.
-
Parking Lot Reconstruction
Repair of pavement and parking lot on school grounds.
-
New Musical Instruments
Purchase of new musical instruments and pianos for music classrooms and auditoriums.
What's Happening
Browse Projectsactive Projects
-
New Mitchell Elementary
2023-2027 Mitchell Elementary -
A/C and Lighting Upgrades
2024 Abbot Elementary -
A/C and Lighting Upgrades
2024 Haisley Elementary
complete Projects
-
Plaza and Cafeteria Renovations
2024 Tappan Middle School -
Pool Monorail Installation & Pool Filtration System Upgrades
2024 Huron High School -
South Lawn Drainage Improvements
2024 Lawton Elementary