Huron High School

Huron High School, originally constructed in 1969, is a three-story masonry structure with exterior brick veneer. The school facility is situated on 55.5 acres in the east sector of Ann Arbor. The original structure has experienced at least 4 additions over the years, and currently supports Grades 9-12.

Stats

  • Building Size405,187 sq ft
  • Land Area55.5 acres

Projects

All Active Complete Upcoming
  • Pool Monorail Installation & Pool Filtration System Upgrades

    2024

    Install Monorail. Upgrade the existing pool filtration system: new pool pumps and tanks, new ADA lift for pool, new starter blocks, electrical upgrade with new switchgear and transformer.

     

  • Kitchen Servery

    2024

    Upgrade electrical to accommodate new equipment, installation of new kitchen line serving equipment.

  • Storm Damage Repair

    2024

    Repair roof and existing greenhouse after storm damage.

  • Exterior Masonry Restoration

    2024

    Repair and replace brick on exterior wall.

  • Theater Rigging Improvements

    2023

    Replace existing counterweight stage rigging system with new electronic hoist system.

  • Site Lighting Upgrades

    2023

    Replacement of existing exterior lights throughout the property.

     

     

  • Paving Project

    2023

    Repair of pavement and parking lots on school grounds.

     

  • Stair Rehabilitation

    2023

    Replacement of deteriorated entry stairs to athletic wing.

     

  • Emergency Exterior Wall Removal

    2023

    Partial removal of existing exterior wall.

  • Track Retaining Wall Repair

    2023

    Repair and replacement of existing track retaining wall.

  • Partial Roof Replacement

    2022

    Replacement of building roof system prior to installation of new solar array on roof. The roof replacement for over the pool and auditorium will take place in Summer of 2021 and the roof over the theater will be replaced in 2022.

  • Solar Array Installation

    2021

    New solar array installed on the roof.

  • New Athletic Turf

    2020

    The football and soccer stadium received a new turf with an organic fill.

     

  • Running Track Repairs & Updates

    2020

    Updates and repairs were made to the running track.

  • HVAC Building Management System Upgrades

    2019

    Updated the school’s Building Management System (BMS) to the latest version including a new graphical interface and mobile, cloud-based access. The upgrades allow for better systems control, improved occupant comfort and energy efficiency.

  • Water Bottle Filling Stations

    2019

    Installation of filtered water bottle filling stations throughout the school.

  • Security Updates

    2019

    Update to security system on property.

  • New Classroom Furniture

    2018

    New, flexible, classroom furniture was added to create a more accessible, engaging and student-centered environment.

  • Tennis Court Renewal

    2018

    School tennis courts were refinished.

  • Roofing Project

    2018

    Dome and bridge construction.

  • HVAC Upgrades in Gym and Locker Rooms

    2018

    Both the gym and locker rooms underwent upgrades to the HVAC system.

  • Chiller Replacement

    2018

    The building’s chiller was replaced.

  • HVAC Replacement in Athletic Wing

    2018

    The athletic wing of the school went through a complete replacement of the HVAC system.

  • Parking Lot Repairs

    2017

    Repair of pavement and parking lot on school grounds.

  • New Musical Instruments

    2017-2018

    Purchase of new musical instruments and pianos for music classrooms and auditoriums.

  • Intermediate Summer Project

    Summer 2028
  • Major Project