Slauson Middle School

Slauson Middle School, originally constructed in 1937, is a three-story masonry structure with exterior brick veneer. The school facility is situated on 12 acres in the northwest sector of Ann Arbor. The original structure has experienced at least 4 additions over the years, and currently supports Grades 6-8.

Stats

  • Building Size190,090 sq ft
  • Land Area12 acres

Projects

All Active Complete Upcoming
  • Major Project

    2025

  • Boiler Ductwork Replacement

    2021

    Replacement of boiler ductwork.

  • Theater Rigging Improvements

    2021-2022

    Replace existing counterweight stage rigging system with new electronic hoist system.

  • HVAC Building Management System Upgrades

    2019

    Updated the school’s Building Management System (BMS) to the latest version including a new graphical interface and mobile, cloud-based access. The upgrades allow for better systems control, improved occupant comfort and energy efficiency.

  • Water Bottle Filling Stations

    2019

    Installation of filtered water bottle filling stations throughout the school.

  • Security Updates

    2019

    Update to security system on property.

  • Public Address and Clocks Replacement

    2019

    Installed a new internet protocol digital public address and clock system that is managed through a single integrated platform.  The new system allows for ease of programming, the integration of phone systems and mobile devices, and enhanced alerts in case of emergency situations, with both visual and audible messages.

  • New Classroom Furniture

    2018

    New, flexible, classroom furniture was added to create a more accessible, engaging and student-centered environment.

  • Pool Heating Boiler Replacement

    2018

    New boiler added to the building for the pool.

  • Parking Lot Repairs

    2017

    Repair of pavement and parking lot on school grounds.

  • New Musical Instruments

    2017-2018

    Purchase of new musical instruments and pianos for music classrooms and auditoriums.

  • Fire Suppression

    2023-2024

    New fire alarm system, added fire suppression system, electrical service upgrade, and new ceilings will also be installed.

  • Roofing Updates

    Construction/repairs of school roof.

  • A/C and Lighting Upgrades

    2024

    Addition of air conditioning and replacement of existing lights with LED light fixtures. Classrooms to have a dimmable lighting system and new ceiling tiles.

  • Solar Array Installation

    New solar array installed on the roof.

  • Paving Project

    2028

    Repair of pavement on school grounds.