Clague Middle School

Clague Middle School, originally constructed in 1972, is a two-story masonry structure with exterior brick veneer. The school facility is situated on 23.5 acres in the northeast sector of Ann Arbor. The original structure has not experienced any major additions over the years, and currently supports Grades 6-8.

Stats

  • Building Size156,000 sq ft
  • Land Area23.5 acres

Projects

All Active Complete Upcoming
  • A/C and Lighting Upgrades

    In Progress - Week of 8/26

    Addition of air conditioning and replacement of existing lights with LED light fixtures. Classrooms to have a dimmable lighting system and new ceiling tiles.

  • Elevator Improvements

    2024

    The existing elevator will be modernized with a new elevator cab, controls, and hydraulic pumps.

     

  • Roof Coating

    2024

    Summer roof coating.

  • Media Center Lighting

    2023

    Replacement of existing lights with LED light fixtures.

     

  • Multi-Purpose Room Lighting

    2023

    Replacement of existing lights with LED light fixtures.

  • Front Entrance Renovation

    2023

    Renovation and beautification of the school’s front entrance.

     

  • Geothermal Digging

    2022

    Installation of an all-electric geothermal heating and cooling system.

  • Window Shades

    2022

    New window shades added to the building.

  • Theater Rigging Improvements

    2021

    Replace existing counterweight stage rigging system with new electronic hoist system.

  • HVAC Building Management System Upgrades

    2019

    Updated the school’s Building Management System (BMS) to the latest version including a new graphical interface and mobile, cloud-based access. The upgrades allow for better systems control, improved occupant comfort and energy efficiency.

  • Water Bottle Filling Stations

    2019

    Installation of filtered water bottle filling stations throughout the school.

  • Security Updates

    2019

    Update to security system on property.

  • Public Address and Clocks Replacement

    2019

    Installed a new internet protocol digital public address and clock system that is managed through a single integrated platform.  The new system allows for ease of programming, the integration of phone systems and mobile devices, and enhanced alerts in case of emergency situations, with both visual and audible messages.

  • Pool Heating Boiler Replacement

    2018

    New boiler added to the building for the pool.

  • New Classroom Furniture

    2017

    New, flexible, classroom furniture was added to create a more accessible, engaging and student-centered environment.

  • New Musical Instruments

    2017-2018

    Purchase of new musical instruments and pianos for music classrooms and auditoriums.

  • Tennis Court Renewal

    2016

    School tennis courts were refinished.

  • Roofing Updates

    Construction/repairs of school roof.

  • Paving Project

    2025

    Reseal and stripe of pavement on school grounds.

  • Intermediate Summer Project

    Summer 2029
  • Major Project

What's Happening

Browse Projects