Scarlett Middle School

Scarlett Middle School, originally constructed in 1968, is a two-story masonry structure with exterior brick veneer. The school facility is situated on 30.5 acres in the southeast sector of Ann Arbor. The original structure has experienced at least 1 addition over the years, and currently supports Grades 6-8. The Scarlett Middle School site is adjacent to Mitchell Elementary School and the buildings share a parking lot.

Stats

  • Building Size162,758 sq ft
  • Land Area30.5 acres

Projects

All Active Complete Upcoming
  • Exterior Concrete Column Stabilization

    2021-2022

    Remove & replace existing drop off loops located at schools. Add storm water and pedestrian crossings.

  • A/C and Lighting Upgrades

    2021-2022

    Addition of air conditioning and replacement of existing lights with LED light fixtures. Classrooms to have a dimmable lighting system and new ceiling tiles.

  • Fire Suppression

    2021-2022

    New fire alarm system, added fire suppression system, electrical service upgrade, and new ceilings will also be installed.

  • Theater Rigging Improvements

    2021-2022

    Replace existing counterweight stage rigging system with new electronic hoist system.

  • Walk-in cooler replacement

    2021

    A new cooler, lighting, control system, and condensing unit was installed in the kitchen area.

  • Boiler and Pump Installation

    2021

    New boiler and pumps were added to the building.

  • Window Shades

    2021

    New window shades added to the building.

  • Ductwork Installation

    2021

    New ductwork was installed inside the building.

  • Major Paving & Stormwater Project

    2020
  • HVAC Building Management System Upgrades

    2019

    Updated the school’s Building Management System (BMS) to the latest version including a new graphical interface and mobile, cloud-based access. The upgrades allow for better systems control, improved occupant comfort and energy efficiency.

  • Public Address and Clocks Replacement

    2019

    Installed a new internet protocol digital public address and clock system that is managed through a single integrated platform. The new system allows for ease of programming, the integration of phone systems and mobile devices, and enhanced alerts in case of emergency situations, with both visual and audible messages.

  • Security Updates

    2019

    Update to security system on property.

  • Water Bottle Filling Stations

    2019

    Installation of filtered water bottle filling stations throughout the school.

  • New Classroom Furniture

    2018

    New, flexible, classroom furniture was added to create a more accessible, engaging and student-centered environment.

  • Tennis Court Renewal

    2018

    School tennis courts were refinished.

  • New Musical Instruments

    2017-2018

    Purchase of new musical instruments and pianos for music classrooms and auditoriums.

  • Roofing Updates

    2024

    Construction/repairs of school roof.

  • Solar Array Installation

    2024

    New solar array installed on the roof.

  • Paving Project

    2024

    Repair of pavement on school grounds.

  • Outdoor Learning Project

    2024

    Outdoor learning enhancements.

  • Intermediate Summer Project

    2030
  • Major Project

    2035-2036