Pioneer High School

Pioneer High School, originally constructed in 1956, is a three-story masonry structure with exterior brick veneer. The school facility is situated on 177 acres in the southwest sector of Ann Arbor. The original structure has experienced at least 5 additions over the years, and currently supports Grades 9-12.

Stats

  • Building Size404,692 sq ft
  • Land Area177 acres

Projects

All Active Complete Upcoming
  • Theater Audio & Lighting Improvements

    2023

    Installation of new audio and lighting in the theater, as well as structural improvements/support for the plasma screens.

     

  • Auto Lab Improvements

    2023

    New coating of the auto lab floors.

  • Solar Array Screen Wall

    2023

    Construction of a new solar screen wall on the exterior grounds of the school.

  • Theater Rigging Improvements

    Replace existing counterweight stage rigging system with new electronic hoist system.

  • Roofing Updates

    2022

    Construction and repairs of the school roof.

  • Solar Array Installation

    2023

    New solar array installed on the roof.

     

  • Lighting Upgrades

    2022

    Replacement of existing lights with LED light fixtures. Classrooms to have dimmable lighting system.

  • Parking Lot Trees

    2020

    Shade trees were added to the parking lot.

  • Running Track Repairs & Updates

    2020

    Updates and repairs were made to the running track.

  • Major Parking Lot Reconstruction

    2020

    School parking lots went through a major reconstruction and stormwater improvements.

  • Gym and Pool Roof Replacement

    2020

    Roof replacement was completed for both the gym and pool.

  • Kitchen Ventilation System Replacement

    2019

    Replacement of all ventilation in the school kitchen.

  • Pool Filtration Updates & Replacement

    2019

    Updates were made to the school pool.

  • Athletics Access Road

    2019

    Construction and repairs were completed on the athletics access road.

  • HVAC Building Management System Upgrades

    2019

    Updated the school’s Building Management System (BMS) to the latest version including a new graphical interface and mobile, cloud-based access. The upgrades allow for better systems control, improved occupant comfort and energy efficiency.

  • Water Bottle Filling Stations

    2019

    Installation of filtered water bottle filling stations throughout the school.

     

  • Security Updates

    2019

    Update to security system on property.

  • New Athletic Turf

    2019

    The football stadium received a new turf with an organic fill.

     

  • Chiller Replacement

    2019

    The chiller for the building was replaced with a new one.

  • Cafeteria Renovation

    2019

    Renovations to the cafeteria took place including new front doors and new lights in the stairway.

  • Roofing Updates

    2018

    Construction/repairs of multiple sections of the school roof.

  • New Classroom Furniture

    2018

    New, flexible, classroom furniture was added to create a more accessible, engaging and student-centered environment.

  • Tennis Court Renewal

    2018

    School tennis courts were refinished.

  • Emergency Gym Floor Restoration

    2018

    Restoration of the gym floor due to damage.

  • E-Wing Roof

    2018

    Roof repairs on the east wing.

  • New Musical Instruments

    2017-2018

    Purchase of new musical instruments and pianos for music classrooms and auditoriums.

What's Happening

Browse Projects