Pattengill Elementary

Pattengill Elementary, originally constructed in 1957, is a one-story masonry structure with masonry walls and an exterior brick veneer. The school facility is situated on 11.33 acres in the south east sector of Ann Arbor. The original school building has experienced at least one major addition over the years, and currently supports 17 traditional classrooms for grades 3-5 education. Pattengill underwent significant renovations to classrooms and academic spaces in 2019-2020 through the use of Sinking Fund dollars.

Stats

  • Building Size53,800 sq ft
  • Land Area11.33 acres
  • Test Stat Test Value

Projects

All Active Complete Upcoming
  • Paving Project

    2022

    Reseal and stripe of pavement on school grounds.

  • Classroom Renovation & A/C Upgrades

    2020

    Addition of air conditioning and replacement of existing lights with LED light fixtures. Classrooms to have dimmable lighting system.

  • Solar Array Installation

    2020

    New solar array installed on the roof.

  • Playground Shaded Trees

    2019-2020

    Planted 24 native hardwood trees for shading of playgrounds and other outdoor environments.

  • Renovations to Common Areas and STEAM Lab

    2019

    Renovation updates to the STEAM Lab and surrounding common areas.

  • Water Bottle Filling Stations

    2019

    Installation of filtered water bottle filling stations throughout the school.

     

  • Security Updates

    2019

    Update to security system on property.

  • HVAC Building Management System Upgrades

    2019

    Updated the school’s Building Management System (BMS) to the latest version including a new graphical interface and mobile, cloud-based access. The upgrades allow for better systems control, improved occupant comfort and energy efficiency.

  • New Playground Equipment

    2018

    New playground was added. Equipment includes sensory wave, tire swings, ropes course, slides and an assortment of climbing structures.

  • Fire Restoration

    2018

    Fire restoration of 2 restrooms, hallways and adjacent spaces.

  • Structural Repair to Computer Lab

    2018

    Repair of computer lab footings and slab.

  • Parking Lot Repairs

    2017

    Patching and repair of school parking lot.

  • New Classroom Furniture

    2017

    New, flexible, classroom furniture was added to create a more accessible, engaging and student-centered environment.

  • New Musical Instruments

    2017

    Purchase of new musical instruments and pianos for music classrooms and auditoriums.