Ann Arbor Open School was originally constructed in 1923 as Mack Elementary School. In 2007, a major renovation and addition took place to incorporate a K-8 education, which doubled the size of the building. The original three-story masonry structure consists of a brick and stone veneer exterior and is situated on 7 acres in the northwest sector of Ann Arbor and supports Kindergarten – Grade 8.
Ann Arbor Open School
- Built In 1923
- Grades Kindergarten-8th
- School Website
Projects
-
Electrical Upgrades
Installed new switchgear.
-
Lighting Upgrades
Replacement of existing lights with LED light fixtures.
-
Media Center Improvements
Improvements and updates to the existing media center.
-
New Natural Playground
A new natural playground was added. Equipment includes landform hills, permeable pavers, timber council ring, a cobble stone stream, and other elements.
-
HVAC Building Management System Upgrades
Updated the school’s Building Management System (BMS) to the latest version including a new graphical interface and mobile, cloud-based access. The upgrades allow for better systems control, improved occupant comfort and energy efficiency.
-
Water Bottle Filling Stations
Installation of filtered water bottle filling stations throughout the school.
-
Security Updates
Update to security system on property.
-
Playground Shaded Trees
Planted 12 native hardwood trees for shading of playgrounds and other outdoor environments.
-
Tennis Court Renewal
School tennis courts were refinished.
-
Parking Lot Construction
Repair of pavement and parking lot on school grounds.
-
New Musical Instruments
Purchase of new musical instruments and pianos for music classrooms and auditoriums.
-
New Classroom Furniture
New, flexible, classroom furniture was added to create a more accessible, engaging and student-centered environment.
Schools
What's Happening
Browse Projectsactive Projects
-
New Mitchell Elementary
2023-2027 Mitchell Elementary -
A/C and Lighting Upgrades
2024 Abbot Elementary -
A/C and Lighting Upgrades
2024 Haisley Elementary
complete Projects
-
Plaza and Cafeteria Renovations
2024 Tappan Middle School -
Pool Monorail Installation & Pool Filtration System Upgrades
2024 Huron High School -
South Lawn Drainage Improvements
2024 Lawton Elementary