Ann Arbor Open School

Ann Arbor Open School was originally constructed in 1923 as Mack Elementary School. In 2007, a major renovation and addition took place to incorporate a K-8 education, which doubled the size of the building. The original three-story masonry structure consists of a brick and stone veneer exterior and is situated on 7 acres in the northwest sector of Ann Arbor and supports Kindergarten – Grade 8.

Stats

  • Building Size88,513 sq ft
  • Land Area7 acres

Name(Required)
This field is for validation purposes and should be left unchanged.

Projects

All Active Complete Upcoming
  • Loading Dock & Paving Repairs

    2025

    To stabilize the existing infrastructure and to support improvements consistent with the Facility Condition Assessment Report, loading dock and paving repairs will be performed at Ann Arbor Open.

  • Electrical Upgrades

    2024

    Installed new switchgear.

     

     

     

     

     

  • Lighting Upgrades

    2023

    Replacement of existing lights with LED light fixtures.

     

     

     

     

     

     

  • Media Center Improvements

    2023

    Improvements and updates to the existing media center.

  • New Natural Playground

    2019

    A new natural playground was added. Equipment includes landform hills, permeable pavers, timber council ring, a cobble stone stream, and other elements.

  • HVAC Building Management System Upgrades

    2019

    Updated the school’s Building Management System (BMS) to the latest version including a new graphical interface and mobile, cloud-based access. The upgrades allow for better systems control, improved occupant comfort and energy efficiency.

  • Water Bottle Filling Stations

    2019

    Installation of filtered water bottle filling stations throughout the school.

  • Security Updates

    2019

    Update to security system on property.

  • Playground Shaded Trees

    2019-2020

    Planted 12 native hardwood trees for shading of playgrounds and other outdoor environments.

  • Tennis Court Renewal

    2018

    School tennis courts were refinished.

  • Parking Lot Construction

    2017

    Repair of pavement and parking lot on school grounds.

  • New Musical Instruments

    2017-2018

    Purchase of new musical instruments and pianos for music classrooms and auditoriums.

  • New Classroom Furniture

    2017

    New, flexible, classroom furniture was added to create a more accessible, engaging and student-centered environment.