Pathways to Success Academic Campus was originally constructed in 1949 as Stone School Elementary. In 2006, the building was changed to Stone High School and later the name changed to Pathways to Success Academic Campus. The original building is a one-story masonry structure with exterior brick veneer and pre-manufactured steel with metal claddings. The school facility is situated on 6.5 acres in the southeast sector of Ann Arbor. The original structure has experienced at least 4 additions over the years, and currently supports Grades 9-12.

Summer Site Investigation Activities:

In order to support our upcoming projects at this site, we are undertaking a series of soils investigations related to geothermal soil resistivity conductivity, structural soil bearing capacity, and stormwater soil infiltration.

These investigations will involve equipment used to produce soil borings for analysis and some limited excavations. In some cases, minor shrub and tree clearing will be required to provide access to the necessary boring locations and the required equipment.

Stats

  • Building Size38,402 sq ft
  • Land Area6.5 acres

Projects

All Active Complete Upcoming

For the latest bond project news and updates for Pathways High School, please see below.

Pathways High School Bond Project Update – April 11, 2023

  • New Pathways to Success Academic Campus

    2023-2026

    New two-story school to be built adjacent to the existing Pathways building, which will be demolished after New Pathways is occupied at the start of the 2026 School Year.

  • HVAC Building Management System Upgrades

    2019

    Updated the school’s Building Management System (BMS) to the latest version including a new graphical interface and mobile, cloud-based access. The upgrades allow for better systems control, improved occupant comfort and energy efficiency.

  • Water Bottle Filling Stations

    2019

    Installation of filtered water bottle filling stations throughout the school.

  • Security Updates

    2019

    Update to security system on property.

  • New Classroom Furniture

    2018

    New, flexible, classroom furniture was added to create a more accessible, engaging and student-centered environment.

  • Parking Lot Repairs

    2017

    Repair of pavement and parking lot on school grounds.

  • Paving Project

    Reseal and stripe of pavement on school grounds.