Skyline High School

Skyline High School, originally constructed in 2008, is a four-story masonry structure with exterior brick veneer. The school facility has a geothermal system with onsite storm water detention systems and a protected wildlife area. It is situated on 108 acres in the northwest sector of Ann Arbor and currently supports Grades 9-12.

Stats

  • Building Size380,564 sq ft
  • Land Area108 acres

Projects

All Active Complete Upcoming
  • Roof Coating

    2024

    Summer roof coating.

  • Stormwater & Irrigation Improvements

    2022

    Upgrade and maintain existing system to improve storm water management.

  • Building Envelope

    2022

    Review existing building envelope to improve on energy efficiency.

  • Running Track Repairs & Updates

    2020

    Updates and repairs were made to the running track.

  • New Baseball & Softball Dugouts

    2020

    New dugouts were added to the baseball and softball fields.

  • Gym Ductwork Replacement

    2019

    Ductwork was replaced in both the main and auxiliary gyms.

  • HVAC Building Management System Upgrades

    2019

    Updated the school’s Building Management System (BMS) to the latest version including a new graphical interface and mobile, cloud-based access. The upgrades allow for better systems control, improved occupant comfort and energy efficiency.

  • Water Bottle Filling Stations

    2019

    Installation of filtered water bottle filling stations throughout the school.

     

  • Security Updates

    2019

    Update to security system on property.

  • New Athletic Turf

    2019

    The football stadium received a new turf with an organic fill.

  • Supplemental Boiler Installation

    2019

    Boiler installed in building.

  • Parking Lot Reconstruction

    2018

    Repair of school parking lot.

     

  • Eagle Sculpture Installation

    2018

    Installation of school mascot sculpture in the front exterior of the building.

     

  • New Classroom Furniture

    2018

    New, flexible, classroom furniture was added to create a more accessible, engaging and student-centered environment.

  • Tennis Court Renewal

    2018

    School tennis courts were refinished.

     

  • Pool Ductwork Replacement

    2018

    Updates were made to the ductwork of the school pool.

  • New Musical Instruments

    2017-2018

    Purchase of new musical instruments and pianos for music classrooms and auditoriums.

  • Parking Lot Improvements

    2024

    Improvements and replacement of existing parking lots.

  • Initial Summer Project

    2024
  • Final Summer Project

    2025
  • Elevator Improvements

    2025-2026

    The existing elevator will be modernized with new equipment.

  • Intermediate Summer Project

    Summer 2028

What's Happening

Browse Projects