Projects
-
Auxiliary Athletic Field Synthetic Turf Replacement
Removal, disposal, and replacement of existing auxiliary athletic field. Install new synthetic athletic turf at the existing athletic field during Summer 2025.
-
Redundant HVAC Chiller & Geothermal Improvements
This redundant system will serve as backup in the event of primary system failure; provide supplemental cooling during extreme heat waves; and allow the existing horizontal loop geothermal system to be temporarily taken offline to perform modifications and improvements to the heating, ventilation, and air conditioning system. This project is intended to improve reliability and performance for students, staff and school community, while increasing the overall efficiency of the system, reducing operating costs and carbon footprint.

-
Pool Scoreboard
Purchase and install new, full color LED scoreboard on the pool deck.
-
Roof Coating


-
Solar Array Installation
New solar array installed on the roof, Summer of 2024.
-
Stormwater & Irrigation Improvements
Upgrade and maintain existing system to improve storm water management.
-
Building Envelope
Review existing building envelope to improve on energy efficiency.
-
Running Track Repairs & Updates
Updates and repairs were made to the running track.
-
New Baseball & Softball Dugouts
New dugouts were added to the baseball and softball fields.
-
Gym Ductwork Replacement
Ductwork was replaced in both the main and auxiliary gyms.
-
HVAC Building Management System Upgrades
Updated the school’s Building Management System (BMS) to the latest version including a new graphical interface and mobile, cloud-based access. The upgrades allow for better systems control, improved occupant comfort and energy efficiency.
-
Water Bottle Filling Stations
Installation of filtered water bottle filling stations throughout the school.
-
Security Updates
Update to security system on property.
-
New Athletic Turf
The football stadium received a new turf with an organic fill.
-
Supplemental Boiler Installation
Boiler installed in building.
-
Parking Lot Reconstruction
Repair of school parking lot.
-
Eagle Sculpture Installation
Installation of school mascot sculpture in the front exterior of the building.
-
New Classroom Furniture
New, flexible, classroom furniture was added to create a more accessible, engaging and student-centered environment.
-
Tennis Court Renewal
School tennis courts were refinished.
-
Pool Ductwork Replacement
Updates were made to the ductwork of the school pool.
-
New Musical Instruments
Purchase of new musical instruments and pianos for music classrooms and auditoriums.
Skyline High School
- Built In 2008
- Grades 9th-12th
- School Website
Skyline High School, originally constructed in 2008, is a four-story masonry structure with exterior brick veneer. The school facility has a geothermal system with onsite storm water detention systems and a protected wildlife area. It is situated on 108 acres in the northwest sector of Ann Arbor and currently supports Grades 9-12.