Projects
-
Flooring & Paint
Selected flooring & painting in progress throughout school.
-
Paving Repairs
To support improvements consistent with the Facility Condition Assessment Report, paving repairs were performed at Community High School.
-
Roofing Updates
Roof replacement work completed.
-
Elevator Improvements
The existing elevator will be modernized with a new elevator cab, controls, and hydraulic pumps.
-
Fire Suppression
New fire alarm system, added fire suppression system and electrical service upgrade.
-
Exterior Restoration
Restoration to the school grounds.
-
A/C and Lighting Upgrades
Addition of air conditioning and replacement of existing lights with LED light fixtures. Classrooms to have a dimmable lighting system and new ceiling tiles.
-
New Door Installation
Replacement and installation of new doors and hardware throughout the building.
-
HVAC Building Management System Upgrades
Updated the school’s Building Management System (BMS) to the latest version including a new graphical interface and mobile, cloud-based access. The upgrades allow for better systems control, improved occupant comfort and energy efficiency.
-
Water Bottle Filling Stations
Installation of filtered water bottle filling stations throughout the school.
-
Security Updates
Update to security system on property.
-
Jazz Practice Room
Jazz practice room was relocated to a new area.
-
Community Cafe
The Community Café was added to the building.
-
New Classroom Furniture
New, flexible, classroom furniture was added to create a more accessible, engaging and student-centered environment.
-
Boiler Replacement
New boiler added to the building.
-
Media Center Carpet
New carpet was added to the media center.
-
Parking Lot Repairs
Repair of pavement and parking lot on school grounds.
-
New Musical Instruments
Purchase of new musical instruments and pianos for music classrooms and auditoriums.
Community High School
- Built In 1922
- Grades 9th-12th
- School Website
Community High School was originally constructed in 1922 as the Jones Elementary School. In 1972, the building was changed to Community High School. The original building is a three-story masonry structure with exterior brick veneer. The school facility is situated on 3.2 acres in the center of downtown Ann Arbor. The original structure has experienced 2 additions over the years, and currently supports Grades 9-12.