Projects
-
Auxiliary Athletic Field Synthetic Turf Replacement
Removal, disposal, and replacement of existing auxiliary athletic field. Install new synthetic athletic turf at the existing athletic field.
-
Pool Locker Room-Locker Replacement
Remove existing pool locker room lockers and install new plastic lockers.
-
Pool Scoreboard
Purchase and install new, full color LED scoreboard on the pool deck.
-
Theater Audio & Lighting Improvements
Installation of new audio and lighting in the theater, as well as structural improvements/support for the plasma screens.
-
Auto Lab Improvements
New coating of the auto lab floors.
-
Solar Array Screen Wall
Construction of a new solar screen wall on the exterior grounds of the school.
-
Theater Rigging Improvements
Replace existing counterweight stage rigging system with new electronic hoist system.
-
Roofing Updates
Construction and repairs of the school roof.
-
Solar Array Installation
New solar array installed on the roof.
-
Lighting Upgrades
Replacement of existing lights with LED light fixtures. Classrooms to have dimmable lighting system.
-
Parking Lot Trees
Shade trees were added to the parking lot.
-
Running Track Repairs & Updates
Updates and repairs were made to the running track.
-
Major Parking Lot Reconstruction
School parking lots went through a major reconstruction and stormwater improvements.
-
Gym and Pool Roof Replacement
Roof replacement was completed for both the gym and pool.
-
Kitchen Ventilation System Replacement
Replacement of all ventilation in the school kitchen.
-
Pool Filtration Updates & Replacement
Updates were made to the school pool.
-
Athletics Access Road
Construction and repairs were completed on the athletics access road.
-
HVAC Building Management System Upgrades
Updated the school’s Building Management System (BMS) to the latest version including a new graphical interface and mobile, cloud-based access. The upgrades allow for better systems control, improved occupant comfort and energy efficiency.
-
Water Bottle Filling Stations
Installation of filtered water bottle filling stations throughout the school.
-
Security Updates
Update to security system on property.
-
New Athletic Turf
The football stadium received a new turf with an organic fill.
-
Chiller Replacement
The chiller for the building was replaced with a new one.
-
Cafeteria Renovation
Renovations to the cafeteria took place including new front doors and new lights in the stairway.
-
Roofing Updates
Construction/repairs of multiple sections of the school roof.
-
New Classroom Furniture
New, flexible, classroom furniture was added to create a more accessible, engaging and student-centered environment.
-
Tennis Court Renewal
School tennis courts were refinished.
-
Emergency Gym Floor Restoration
Restoration of the gym floor due to damage.
-
E-Wing Roof
Roof repairs on the east wing.
-
New Musical Instruments
Purchase of new musical instruments and pianos for music classrooms and auditoriums.
Pioneer High School
- Built In 1956
- Grades 9th-12th
- School Website
Pioneer High School, originally constructed in 1956, is a three-story masonry structure with exterior brick veneer. The school facility is situated on 177 acres in the southwest sector of Ann Arbor. The original structure has experienced at least 5 additions over the years, and currently supports Grades 9-12.