Updates

4/9/2025

Community Open House

RSVPs are being accepted here!

Click here to see information on hand at the Open House

1/6/2025

Project Kick-off

Projects

This field is for validation purposes and should be left unchanged.
Name(Required)
  • New King Elementary

    2025-2029

    Architect of Record: Stantec

  • Expanded Servery Line

    2019

    The servery line in the school was expanded for better use.

  • HVAC Building Management System Upgrades

    2019

    Updated the school’s Building Management System (BMS) to the latest version including a new graphical interface and mobile, cloud-based access. The upgrades allow for better systems control, improved occupant comfort and energy efficiency.

  • Water Bottle Filling Stations

    2019

    Installation of filtered water bottle filling stations throughout the school.

  • Security Updates

    2019

    Update to security system on property.

  • Playground Shaded Trees

    2019-2020

    Planted 20 native hardwood trees for shading of playgrounds and other outdoor environments.

  • Parking Lot Reconstruction

    2018

    Repair of pavement and parking lot on school grounds, with an addition of an ADA sidewalk and rear drainage.

  • New Playground Equipment

    2018

    New playground added. New equipment includes 3 tri-nets with attached twisted net, stepping pods and climbers.

  • New Classroom Furniture

    2017

    New, flexible, classroom furniture was added to create a more accessible, engaging and student-centered environment.

  • New Musical Instruments

    2017-2018

    Purchase of new musical instruments and pianos for music classrooms and auditoriums.

  • Modular Addition

    2017

    An addition was added to the school.

King Elementary

Stats

  • Building Size52,200 sq ft
  • Land Area9.96 acres

King Elementary, originally constructed in 1969, is a one-story masonry structure with exterior brick veneer. The school facility is situated on 9.96 acres in the east sector of Ann Arbor. The original structure has experienced 1 addition over the years, and currently supports Young 5 – Grade 5.

What's Happening

Browse Projects