Projects
-
Roof Replacement
Summer replacement of roof.
-
A/C and Lighting Upgrades
Addition of air conditioning and replacement of existing lights with LED light fixtures. Classrooms to have a dimmable lighting system and new ceiling tiles.
-
Window Shades
New window shades added to the building.
-
New Playground Equipment
New playground equipment for grades 3-5 – located on west side of building.
-
Roofing Upgrades
Construction/repairs of school roof.
-
HVAC Building Management System Upgrades
Updated the school’s Building Management System (BMS) to the latest version including a new graphical interface and mobile, cloud-based access. The upgrades allow for better systems control, improved occupant comfort and energy efficiency.
-
New Playground Equipment
New playground equipment was added to school grounds.
-
Water Bottle Filling Stations
Installation of filtered water bottle filling stations throughout the school.
-
Security Updates
Update to security system on property.
-
Playground Shaded Trees
Planted 12 native hardwood trees for shading of playgrounds and other outdoor environments.
-
Parking Lot Reconstruction
Repair of pavement and parking lot on school grounds.
-
New Musical Instruments
Purchase of new musical instruments and pianos for music classrooms and auditoriums.
-
New Classroom Furniture
New, flexible, classroom furniture was added to create a more accessible, engaging and student-centered environment.
Eberwhite Elementary
- Built In 1950
- Grades Young 5-5th
- School Website
Eberwhite Elementary, originally constructed in 1950, is a two-story masonry structure with exterior brick veneer. The school facility is situated on 42.2 acres in the southwest sector of Ann Arbor. The original structure has experienced at least 2 addition over the years, and currently supports Y5 – Grade 5.






























