Lawton Elementary

Lawton Elementary, originally constructed in 1963, is a one-story masonry structure with exterior brick veneer. The school facility is situated on 7.7 acres in the southwest sector of Ann Arbor. The original structure has experienced at least 2 additions over the years, and currently supports Y5 – Grade 5.

Stats

  • Building Size59,009 sq ft
  • Land Area7.7 acres

Projects

All Active Complete Upcoming

Summer Construction Update!

You might notice some work taking place in and around your school this summer. Construction will begin during summer break on projects approved as part of the 2019 bond, including those that will enhance the health, safety and learning experience for students and staff. This summer Lawton Elementary will be receiving improvements in air conditioning, lighting, ceiling replacements, and the installation of new window treatments. This work may result in areas around the school and parking lot that are being blocked off for equipment and construction crew. Thank you for your patience as we complete this work.

More Questions? Visit our FAQ pageĀ here.

  • South Lawn Drainage Improvements

    2024

    Upgrade and maintain existing system to improve storm water drainage in the South lawn.

     

  • Roofing Updates

    2024

    Construction/repairs of school roof.

  • Major Project

    2026

  • A/C and Lighting Upgrades

    2023

    Addition of air conditioning and replacement of existing lights with LED light fixtures. Classrooms to have a dimmable lighting system and new ceiling tiles.

  • Minor Renovation

    2019

    Converted CPU lab into a classroom and made a classroom from portion of library.

  • HVAC Building Management System Upgrades

    2019

    Updated the school’s Building Management System (BMS) to the latest version including a new graphical interface and mobile, cloud-based access. The upgrades allow for better systems control, improved occupant comfort and energy efficiency.

  • Water Bottle Filling Stations

    2019

    Installation of filtered water bottle filling stations throughout the school.

  • Security Updates

    2019

    Update to security system on property.

  • Playground Shaded Trees

    2019-2020

    Planted 9 native hardwood trees for shading of playgrounds and other outdoor environments.

  • New Playground

    2017

    New kindergarten and elementary playgrounds were added. New equipment includes arch swings, astro jumper, sensory wave, climbing net and a merry-go-all.

  • New Musical Instruments

    2017-2018

    Purchase of new musical instruments and pianos for music classrooms and auditoriums.

  • New Classroom Furniture

    2017

    New, flexible, classroom furniture was added to create a more accessible, engaging and student-centered environment.

  • Parking Lot Repairs

    2017

    Repair of pavement and parking lot on school grounds.

  • Roofing Updates

    2024

    Construction and repairs of the school roof.

     

  • Paving Project

    Summer 2026

    Patching and repair of pavement on school grounds.