Burns Park Elementary

Burns Park Elementary, originally constructed in 1923, is a three-story masonry structure with exterior brick veneer. The school facility is situated on 4 acres towards the center of Ann Arbor. The original structure has experienced at least 2 additions over the years, and currently supports Grades 1-5.

Stats

  • Building Size60,992 sq ft
  • Land Area4 acres

Name
This field is for validation purposes and should be left unchanged.

Projects

All Active Complete Upcoming

For the latest bond project news and updates for Burns Park Elementary, please see below.

  • Burns Park Major Renovation

    Architect of Record: Quinn Evans

  • A/C and Lighting Upgrades

    2021-2022

    Addition of air conditioning and replacement of existing lights with LED light fixtures. Classrooms to have a dimmable lighting system and new ceiling tiles.

  • Elevator Improvements

    2020

    The existing elevator will be modernized with a new elevator cab, controls, and hydraulic pumps.

  • HVAC Building Management System Upgrades

    2019

    Updated the school’s Building Management System (BMS) to the latest version including a new graphical interface and mobile, cloud-based access. The upgrades allow for better systems control, improved occupant comfort and energy efficiency.

  • Water Bottle Filling Stations

    2019

    Installation of filtered water bottle filling stations throughout the school.

  • Security Updates

    2019

    Update to security system on property.

  • Playground Shaded Trees

    2019-2020

    Planted 3 native hardwood trees for shading of playgrounds and other outdoor environments.

  • Roofing Updates

    2018

    Construction/repairs of school roof.

  • Parking Lot Repairs

    2017

    Patching and repair of school parking lot and recreational areas.

  • New Musical Instruments

    2017-2018

    Purchase of new musical instruments and pianos for music classrooms and auditoriums.

  • New Classroom Furniture

    2017

    New, flexible, classroom furniture was added to create a more accessible, engaging and student-centered environment.

  • Modular Addition

    2017

    An addition was added to the school.

  • New Playground Equipment

    2014

    New playground equipment was added to school grounds.