Wines Elementary

Wines Elementary, originally constructed in 1960, is a one-story masonry structure with exterior brick veneer situated on 10 acres in the northwest sector of Ann Arbor. The original structure supports 17 traditional classrooms and the school added 6 more classrooms with the installation of a modular classrooms building in 2018 (23 total classrooms). The Wines Elementary site is adjacent to Forsythe Middle School and the buildings share a large, connected campus.

Stats

  • Building Size49,482 sq ft
  • Land Area10 acres

Name
This field is for validation purposes and should be left unchanged.

Projects

All Active Complete Upcoming

For the latest bond project news and updates for Wines Elementary, please see below.

  • New Wines Elementary

    2025-2029 See More

    Architect of Record: Hobbs + Black, Fanning Howey

  • A/C and Lighting Upgrades

    2023

    Addition of air conditioning and replacement of existing lights with LED light fixtures. Classrooms to have a dimmable lighting system and new ceiling tiles.

  • A/C and Lighting Upgrades

    2023

    Addition of air conditioning and replacement of existing lights with LED light fixtures. Classrooms to have a dimmable lighting system and new ceiling tiles.

  • Paving Project

    2022

    Patching and repair of pavement on school grounds.

  • Window Shades

    2022

    New window shades added to the building.

  • Playground Shaded Trees

    2019-2020

    Planted 52 native hardwood trees for shading of playgrounds and other outdoor environments.

  • HVAC Building Management System Upgrades

    2019

    Updated the school’s Building Management System (BMS) to the latest version including a new graphical interface and mobile, cloud-based access. The upgrades allow for better systems control, improved occupant comfort and energy efficiency.

  • Water Bottle Filling Stations

    2019

    Installation of filtered water bottle filling stations throughout the school.

  • Security Updates

    2019

    Update to security system on property.

  • New Playground Equipment

    2019

    New upper elementary playground was added to school. New equipment includes several slides, climbing walls, stepping platforms and ladders.

  • Boiler Replacement

    2018

    New boiler added to the building.

  • Modular Building Replacement

    2018

    Replace existing structure with 6 new classrooms.

  • New Classroom Furniture

    2017

    New, flexible, classroom furniture was added to create a more accessible, engaging and student-centered environment.

  • Parking Lot Reconstruction

    2017

    Reconstruction of school parking lot.

     

  • New Musical Instruments

    2017

    Purchase of new musical instruments and pianos for music classrooms and auditoriums.