Skyline High School

Skyline High School, originally constructed in 2008, is a four-story masonry structure with exterior brick veneer. The school facility has a geothermal system with onsite storm water detention systems and a protected wildlife area. It is situated on 108 acres in the northwest sector of Ann Arbor and currently supports Grades 9-12.

Stats

  • Building Size380,564 sq ft
  • Land Area108 acres

Projects

All Active Complete Upcoming
  • Redundant HVAC Chiller & Geothermal Improvements

    2024 - 2025

    This redundant system will serve as backup in the event of primary system failure; provide supplemental cooling during extreme heat waves; and allow the existing horizontal loop geothermal system to be temporarily taken offline to perform modifications and improvements to the heating, ventilation, and air conditioning system. This project is intended to improve reliability and performance for students, staff and school community, while increasing the overall efficiency of the system, reducing operating costs and carbon footprint.

  • Auxiliary Athletic Field Synthetic Turf Replacement

    2025

    Removal, disposal, and replacement of existing auxiliary athletic field. Install new synthetic athletic turf at the existing athletic field.

  • Pool Scoreboard

    2025

    Purchase and install new, full color LED scoreboard on the pool deck.

  • Roof Coating

    2024

     

  • Solar Array Installation

    2024

    New solar array installed on the roof, Summer of 2024.

     

     

     

     

     

  • Stormwater & Irrigation Improvements

    2022

    Upgrade and maintain existing system to improve storm water management.

  • Building Envelope

    2022

    Review existing building envelope to improve on energy efficiency.

  • Running Track Repairs & Updates

    2020

    Updates and repairs were made to the running track.

  • New Baseball & Softball Dugouts

    2020

    New dugouts were added to the baseball and softball fields.

  • Gym Ductwork Replacement

    2019

    Ductwork was replaced in both the main and auxiliary gyms.

  • HVAC Building Management System Upgrades

    2019

    Updated the school’s Building Management System (BMS) to the latest version including a new graphical interface and mobile, cloud-based access. The upgrades allow for better systems control, improved occupant comfort and energy efficiency.

  • Water Bottle Filling Stations

    2019

    Installation of filtered water bottle filling stations throughout the school.

     

  • Security Updates

    2019

    Update to security system on property.

  • New Athletic Turf

    2019

    The football stadium received a new turf with an organic fill.

  • Supplemental Boiler Installation

    2019

    Boiler installed in building.

  • Parking Lot Reconstruction

    2018

    Repair of school parking lot.

     

  • Eagle Sculpture Installation

    2018

    Installation of school mascot sculpture in the front exterior of the building.

     

  • New Classroom Furniture

    2018

    New, flexible, classroom furniture was added to create a more accessible, engaging and student-centered environment.

  • Tennis Court Renewal

    2018

    School tennis courts were refinished.

     

  • Pool Ductwork Replacement

    2018

    Updates were made to the ductwork of the school pool.

  • New Musical Instruments

    2017-2018

    Purchase of new musical instruments and pianos for music classrooms and auditoriums.