Project Status
Stormwater:
As part of the permitting process, contractors developed a maintenance and monitoring plan to ensure proactive, consistent, and responsible management of stormwater controls. This includes measures before and after storm events, with particular attention given to Eighth Street.
Indoor Air Sampling:
The district has received inquiries regarding documented radon levels at existing schools, particularly those located adjacent to construction sites. More information regarding AAPS radon testing can be found on the Assessments & Surveys web page.
Construction Access:
Construction parking and construction access drives are for construction personnel only and to ensure safety, staff and parents should refrain from using construction parking and/or drives.
Slauson Middle School News – November 2025
Current Work, Weather Permitting:
- Foundation work continues.
- Steel framework is expected to begin in December.
- Auxiliary Gym work continues.
Updates
Slauson Middle School Groundbreaking Ceremony: Postponed
A new date will be shared as soon as it is available.
Board of Education Meeting – Capital Program Annual Report
Project Kick-off
Projects
-
Slauson Major Renovation
Architect of Record: Quinn Evans
Construction Manager: McCarthy & Smith, Inc.
-
Community Engagement - Slauson Middle School Renovation
Ann Arbor Public Schools plans to renovate Slauson Middle School, with related site improvements, slated for groundbreaking as early as Spring 2025. Please join us for a Bond Project Update, we will have Phase 2 Bond Plan background information and a conceptual site plan to share.Come to the school’s main entry and you will be directed to the space in the building where the update is being held. We look forward to seeing you!
Monday, September 16, 2024 from 5:30pm to 7pm
Slauson Middle School: 1019 West Washington Street, Ann Arbor, MI 48103
-
Boiler Ductwork Replacement
Replacement of boiler ductwork.
-
Theater Rigging Improvements
Replace existing counterweight stage rigging system with new electronic hoist system.
-
HVAC Building Management System Upgrades
Updated the school’s Building Management System (BMS) to the latest version including a new graphical interface and mobile, cloud-based access. The upgrades allow for better systems control, improved occupant comfort and energy efficiency.
-
Water Bottle Filling Stations
Installation of filtered water bottle filling stations throughout the school.
-
Security Updates
Update to security system on property.
-
Public Address and Clocks Replacement
Installed a new internet protocol digital public address and clock system that is managed through a single integrated platform. The new system allows for ease of programming, the integration of phone systems and mobile devices, and enhanced alerts in case of emergency situations, with both visual and audible messages.
-
New Classroom Furniture
New, flexible, classroom furniture was added to create a more accessible, engaging and student-centered environment.
-
Pool Heating Boiler Replacement
New boiler added to the building for the pool.
-
Parking Lot Repairs
Repair of pavement and parking lot on school grounds.
-
New Musical Instruments
Purchase of new musical instruments and pianos for music classrooms and auditoriums.
Photos & Videos
Photos
Timeline
Slauson Middle School
- Built In 1937
- Grades 6th-8th
- School Website
Slauson Middle School, originally constructed in 1937, is a three-story masonry structure with exterior brick veneer. The school facility is situated on 12 acres in the northwest sector of Ann Arbor. The original structure has experienced at least 4 additions over the years, and currently supports Grades 6-8.