Projects
-
Flooring & Paint
Selected flooring & painting in progress throughout school.


-
Exterior Wing Wall Repair
Repair of exterior wing of the building.
-
Bathroom Renovation
Demolition of existing gym and pool bathrooms. Reconfigure bathroom layout with new flooring and walls; new plumbing and ventilation.
-
Loading Dock & Paving Repairs
To stabilize the existing infrastructure and to support improvements consistent with the Facility Condition Assessment Report, loading dock and paving repairs will be performed at Scarlett.
-
A/C and Lighting Upgrades
Addition of air conditioning and replacement of existing lights with LED light fixtures. Classrooms to have a dimmable lighting system and new ceiling tiles.
-
Roofing Updates
Construction/repairs of school roof.
-
Solar Array Installation
New solar array installed on the roof.
-
Exterior Concrete Column Stabilization
Remove & replace existing drop off loops located at schools. Add storm water and pedestrian crossings.
-
Fire Suppression
New fire alarm system, added fire suppression system, electrical service upgrade, and new ceilings will also be installed.
-
Walk-in cooler replacement
A new cooler, lighting, control system, and condensing unit was installed in the kitchen area.
-
Theater Rigging Improvements
Replace existing counterweight stage rigging system with new electronic hoist system.
-
Boiler and Pump Installation
New boiler and pumps were added to the building.
-
Window Shades
New window shades added to the building.
-
Ductwork Installation
New ductwork was installed inside the building.
-
Major Paving & Stormwater Project
-
HVAC Building Management System Upgrades
Updated the school’s Building Management System (BMS) to the latest version including a new graphical interface and mobile, cloud-based access. The upgrades allow for better systems control, improved occupant comfort and energy efficiency.
-
Water Bottle Filling Stations
Installation of filtered water bottle filling stations throughout the school.
-
Security Updates
Update to security system on property.
-
Public Address and Clocks Replacement
Installed a new internet protocol digital public address and clock system that is managed through a single integrated platform. The new system allows for ease of programming, the integration of phone systems and mobile devices, and enhanced alerts in case of emergency situations, with both visual and audible messages.
-
Tennis Court Renewal
School tennis courts were refinished.
-
New Classroom Furniture
New, flexible, classroom furniture was added to create a more accessible, engaging and student-centered environment.
-
New Musical Instruments
Purchase of new musical instruments and pianos for music classrooms and auditoriums.
Scarlett Middle School
- Built In 1968
- Grades 6th-8th
- School Website
Scarlett Middle School, originally constructed in 1968, is a two-story masonry structure with exterior brick veneer. The school facility is situated on 30.5 acres in the southeast sector of Ann Arbor. The original structure has experienced at least 1 addition over the years, and currently supports Grades 6-8. The Scarlett Middle School site is adjacent to Mitchell Elementary School and the buildings share a parking lot.