Projects
-
Solar Array Installation
New solar array installed on the roof.
-
Roof Replacement
Replacement of building roof system prior to installation of new solar array on roof.
-
Classroom Renovation
Renovations to school classrooms.
-
New Playground Equipment
New Pre-Kindergarten playground was added on the east side of the school. New equipment includes an asphalt area for motor skills development, swings, sensory wave arch, merry-go-all and a play structure with various climbing elements and a slide.
-
Playground Shaded Trees
Planted 18 native hardwood trees for shading of playgrounds and other outdoor environments.
-
Renovations to Common Areas and STEAM Lab
Renovation updates to the STEAM Lab and surrounding common areas.
-
Water Bottle Filling Stations
Installation of filtered water bottle filling stations throughout the school.
-
HVAC Building Management System Upgrades
Updated the school’s Building Management System (BMS) to the latest version including a new graphical interface and mobile, cloud-based access. The upgrades allow for better systems control, improved occupant comfort and energy efficiency.
-
Security Updates
Update to security system on property.
-
Parking Lot Repairs
Patching and repair of school parking lot and recreational areas.
-
New Musical Instruments
Purchase of new musical instruments and pianos for music classrooms and auditoriums.
-
New Classroom Furniture
New, flexible, classroom furniture was added to create a more accessible, engaging and student-centered environment.
-
New Playground Equipment
New playground equipment was added to school grounds.
Bryant Elementary
- Built In 1973
- Grades Preschool-2nd
- School Website
Bryant Elementary, originally constructed in 1973, is a one-story steel framed structure with masonry walls and an exterior brick veneer. The school facility is situated on 7.4 acres in the south sector of Ann Arbor. The original school building has experienced up to 5 additions over the years, and currently supports 17 classrooms for grades K-2 education with an additional two PreK classrooms constructed in 2020 (19 total classrooms). Bryant underwent significant renovations to classrooms and academic spaces in 2019-2020 through the use of Sinking Fund dollars.







































